Final Design
It reads desember and finals has started for myself. So for the time being construction is down on my modules. I'm also moving to a new apartment, where I will have a bigger space.
What I have manage to done is to finish the final design of the modules.
All mesurments are in mm. The two end modules are compatible with O'Norways O scale module system. The green is markings for the trestle of the coal dealer thats going to be there. The rectangle box is where the depot is going to be. The track not parallell to the section sides are going to be a LPG loading/unloading track.
The Station has to be finished with track and electrical before the 18th of April where it will make its premiere at TMJK trainshow. That also include building the trestle. Section number 3 and 4 from left are finished exept for some minor details I'll finish in the beginning of January.
0 Comments:
Legg inn en kommentar
<< Home